Quote Originally Posted by popjin View Post
That would work if engineers are actually competent and bother to have spare cades ready to go. As of current, it's probably better just to have some engineer kit PFCs welding cades than relying on good engies.
I'm talking about a double cade line, with Metal cades in the back line and sandbags in the frontline with a 1 tile separation. The backline metal cades ARE the spare cades.